Subject: 5.9 Approval of Planned Asphalt and Concrete Repairs (Second Read)
Comprehensive School Improvement Plan Reference:
Focus Area: Financial
Key Requirements: Maintain a sound fiscal position with transparency, integrity and efficiency while supporting the strategic goals of the district.
Policy: 3400 - Management of School Facilities
Provide Name(s) of Attachments: Bid Tab
File Attachment:
2018 0413 - Asphalt & Concrete - Bid Tab.pdf
Provide Background Details and Rationale: Various areas of the district have been evaluated and identified for asphalt and/or concrete repairs, replacement or additions.
Proposed areas are at six schools/campuses including Park Hill High, Congress, Park Hill South, Union Chapel, Line Creek and District Office. The work was split into two bid packages.

A mandatory pre-bid walk through with contractors was held April 3, 2018 and bids were collected April 13, 2018.

Two vendors, Blacktop Paving and Wil-Pav, were the low bidders.
Provide Funding Source and Estimated Cost: Funding will be provided from the proposed 2018-2019 Maintenance and Operations Budget. The total cost for both asphalt and concrete packages is $85,448.
Legal References N/A
Name of Persons(s) Submitting Agenda Item with Title Jim Rich, Director of Operations; and Dr. Paul Kelly, Assistant Superintendent for Business & Technology Services.
Presenter(s) if Presentation Anticipated N/A
Recommendation: It is recommended that the Park Hill Board of Education approve the Planned Asphalt and Concrete Repairs; and authorize Dr. Cowherd, Superintendent, or her designee to enter into agreements with recommended bidder based on the bid package specifications.
Approvals:
Recommended By:
Signed By:
Jim Rich - Director of Operations
Signed By:
Dr. Paul Kelly - Assistant Superintendent
Signed By:
Dr. Jeanette Cowherd - Superintendent
Vote Results: